Call Us Today: (800) 462-7733

Products

FLBC101W

SKU: FLBC101W

MPN: FLBC101W

Non Metallic concrete floor box with non metallic covers for new concrete pours. White with Threaded plugs.Includes Box, Mud Cover, Four 3-1/4 plugs, two 1" plugs, 1/8" spacer 1/4" spacer. one 1/2" sp...

$30.97 / EA

Available to order

Local stock: 0
Lead time: 1 - 2 working days

FLBC4500

SKU: FLBC4500

MPN: FLBC4500

Non-metallic 4-1/2" round box with plugs, low voltage divider and mud cover for new concrete pours.

$14.27 / EA

Available to order

Local stock: 0
Lead time: 1 - 2 working days

FLBC4502

SKU: FLBC4502

MPN: FLBC4502

Non Metallic 4-1/2" round box with plugs, low voltage divider, mud cover for new concrete pours. Comes with (6) conduit hubs.

$14.27 / EA

Available to order

Local stock: 0
Lead time: 1 - 2 working days

FLBC4800

SKU: FLBC4800

MPN: FLBC4800

Non Metallic, gangable concrete floor box. Single Gang. Comes with (2) 1-1/4" plugs and mud cover.

$18.92 / EA

Available to order

Local stock: 0
Lead time: 1 - 2 working days

FLBC8500

SKU: FLBC8500

MPN: FLBC8500

SIngle gang non metallic gangable floor box up to 3 gang. Rectangular. Includes (2) 1-1/4" plugs and a mud cover.

$21.20 / EA

Available to order

Local stock: 0
Lead time: 1 - 2 working days

FLBC8502

SKU: FLBC8502

MPN: FLBC8502

For versatile and economical floor box installs in concrete, use Arlington's gangable box kits. The rectangular non-metallic single gang box can be connected together to build a two or three gang box...

$32.77 / EA

Available to order

Local stock: 0
Lead time: 1 - 2 working days

FLBR101BL

SKU: FLBR101BL

MPN: FLBR101BL

Non Metallic Box with non metallic covers for existing floors. Rectangular gasketed, non metallic black cover with threaded plugs.

$21.58 / EA

In stock (1)

FLBR101BR

SKU: FLBR101BR

MPN: FLBR101BR

Non Metallic Box with non metallic covers for existing floors. Rectangular gasketed, non metallic brown cover with threaded plugs.

$19.24 / EA

Available to order

Local stock: 0
Lead time: 1 - 2 working days